akchabar logo with typographysearch
    Main photo
    Image source: www

    Published

    04/03/2025, 18:09

    Construction of a sorting complex is planned at Kara-Keche

    Kyrgyzkomur State Enterprise announced plans to build a sorting complex at the Kara-Keche coal deposit. In this regard, the state enterprise requested commercial proposals for the preparation of feasibility study and design of equipment designed for sorting coal with a capacity of 500 tons per hour.

    The project is aimed at improving the efficiency of coal processing at Kara-Keche deposit.

    The complex will be a modular construction with automated control system of flow-transportation scheme. It will be equipped with reliable equipment, dust suppression and video surveillance system, as well as calibration of especially large stones. The sorting line will include three fractional belts to separate coal into different sizes.

    Interested companies can submit their proposals with conditions, terms of work and cost until April 7.


    Read Similar